Diagnose damage, document evidence, defend the findings

Client Story
TCR diagnosed the storm damage our prior consultant missed, and stood behind the report through final settlement.
Confidential
Regional Carrier Adjuster
our approach

How a TCR investigation runsDocumented, code-aligned, and defensible at every step.

Outcomes carriers and counsel can rely onevidence over opinion

Roof investigations
Forensic evaluations of residential and commercial roof systems — asphalt shingle, mod-bit, TPO, PVC, EPDM, BUR, and metal panel. Test squares, fastener pull-tests, infrared moisture surveys, and historical aerial imagery, tied to manufacturer specs and code.
Talk to an expert
Hail & wind damage assessments
Storm damage documented with ground-truth meteorology — NOAA Storm Events, NWS summaries, mPING, and CoCoRaHS correlated to the date of loss and the property's coordinates. Every finding photographed, measured, and mapped per the Petty methodology.
Talk to an expert
Building envelope & construction defect
Cladding, fenestration, flashings, sealants, and waterproofing evaluated for cause and origin of water intrusion and wind damage. We separate damage from deferred maintenance and cite ICC, IBC, and IRC provisions in effect at the time of construction.
Talk to an expert
Litigation support & expert testimony
Expert services from first site visit through trial — reports, depositions, demonstrative exhibits, and testimony. Every report is written from day one assuming opposing counsel will cross-examine it.
Talk to an expert
Every TCR engagement follows the same disciplined path. Transparent, documented, and built to hold up under review.
Day 1
Assignment & weather review
We confirm scope, parties, and date of loss, then pull ground-truth storm reports for the property's coordinates. Outcome: an investigation plan grounded in the meteorological record.
Week 1
Site investigation
Walk-on and drone inspection, test squares, and moisture survey where warranted — every condition photographed, measured, and mapped. Outcome: a complete evidentiary record.
Week 2
Analysis & code review
Findings are tied to ICC, IBC, and IRC provisions, manufacturer specifications, and ASTM standards in effect at construction. Outcome: cause and extent of damage, separated from wear.
Week 3
Report & testimony
A carrier-ready report written to survive cross-examination, with expert support available through deposition and trial. Outcome: findings that hold.
Work with us

Talk to our experts

Ready to explore this service in detail? 

Connect with Modulabs and define your measurable next step.

Have a property, a claim, or a question?